
Emergency at the construction site
Challenge On day-to-day basis we search for solutions to new or existing applications doing our best to satisfy the needs of our customers as fast as possible. This time it was a real emergency [...]
Rotary union on heavy duty mission!
Challenge Whenever we deal with a gas installation we take special care to provide a reliable and safe solution. This time we had to connect a rigid pipe supplying gas with a steel hose [...]
Double your safety with a twin hose reel!
Challenge We were asked to solve problems connected with rewinding and storing a twin welding hose in a steel mill. Two hose lines, 30m each, require quite a lot of space when laying loose and [...]
Helping to become green
Challenge One of the projects we worked on was serving a power plant which used to have one of the largest SO2 emissions in the world. Such excessively high levels of emissions lay behind the [...]